The project entailed the removal and transport of the vent tower (top elevation + 81.5m LAT) and a crane boom from the Thames Complex, located in Block 49/28 of the Southern North Sea, 80 km north east of the Bacton Terminal to an onshore disposal yard, located in Vlissingen (NL).
Thames installation was a three bridge-linked platforms’ complex: the wellhead (AW) platform, the processing and quarters (AP) platform and the reception platform (AR).
The Thames Complex is approximately 19.5 m from LAT to the cellar deck and 43 m from LAT to the Helideck. The jacket was in a 32.5 m water depth. Production ceased in 2014.